Obama Presidential Center
Chicago, IL
Services Provided:
Reinforcing Steel Install
Post-Tension Cable Install
(2) Tower Crane Erection and Dismantlement
Work Performed For: Concrete Collective
Project Completion: 2023
Scope of Work:
We provided labor for the construction of:
Gateway installed the rebar and post-tension cables for the tower/museum structure for the Plaza Level, Plaza Mezzanine, and Level 2 floors and perimeter walls from Plaza Mezzanine to Level 2. In addition, Gateway erected and dismantled the tower cranes for the parking garage and tower.