Obama Presidential Center

Chicago, IL

Services Provided:

  • Reinforcing Steel Install

  • Post-Tension Cable Install

  • (2) Tower Crane Erection and Dismantlement

Work Performed For: Concrete Collective

Project Completion: 2023

Scope of Work:

We provided labor for the construction of:

  • Gateway installed the rebar and post-tension cables for the tower/museum structure for the Plaza Level, Plaza Mezzanine, and Level 2 floors and perimeter walls from Plaza Mezzanine to Level 2. In addition, Gateway erected and dismantled the tower cranes for the parking garage and tower.